Amusement rides · Attraction systems · Turnkey park packages

Water Attractions

Water Coaster 206m

A 206-meter water coaster with two 20-passenger boats, 15m lift height and 55 km/h top speed.

Request technical sheet

Quick answer

A 206-meter water coaster with two 20-passenger boats, 15m lift height and 55 km/h top speed.

Suitability and boundaries

Model-level specification. Confirm foundation, power supply, site access, applicable standards and final engineering drawings before order confirmation.

water-coaster-206m DINIS attraction

A 206-meter water coaster with two 20-passenger boats, 15m lift height and 55 km/h top speed.

What this attraction is

Track length 206m; gauge 1820mm; lift height 15m; cycle time approximately 3 minutes per boat; equipment class A; lift power 55kW; installed capacity 204kVA; boat count 2; footprint 110m x 50m; capacity 20 passengers per boat; drive motor and chain lift; maximum speed 55 km/h; design life 20 years; lift speed 1.2 m/s; power 3N+PE 380/220V 50Hz.

DINIS positions the water coaster 206m as a water attractions that must be specified against the venue rather than bought as a generic product. The decision inputs are the target guest profile, throughput, footprint, power supply, destination standards and operating model.

Who it is for

Park operators, FEC investors, resort developers and distributors.

The strongest fit is a buyer who can confirm the use case and operating conditions before requesting a quotation. If the venue is still at concept stage, DINIS starts with a configuration review rather than a fixed price.

Where it is used

Family entertainment, parks and destination attractions.

Primary demand: global export markets.

Selection guidance

For water attractions, define water supply, drainage, filtration and safety supervision before equipment selection. A water package should be treated as a system, not a single ride.

Configuration and customization

Theming, station, water treatment integration, operator training

Customization affects lead time, documentation and price. Necessary customization should be separated from optional decoration so the quotation reflects the operating requirement.

Quality, packaging and delivery

Applicable design standards, factory test records and inspection documentation available on request.

Each project package includes the confirmed scope for foundation guidance, installation, commissioning, operator training and spare parts. Delivery is quoted against the destination country, packaging requirements and site access.

Before you request a quotation

  • Target product and preferred configuration
  • Available footprint, site access and height limits
  • Target guest profile and expected throughput
  • Power supply and destination country
  • Customization, packaging and target opening date

Model-level specification. Confirm foundation, power supply, site access, applicable standards and final engineering drawings before order confirmation.

Related resources

Related attractions

Qualified brief first

Send the footprint, guest profile and opening date.

Request technical quotation

How to specify the Water Coaster 206m

The water coaster 206m should be specified against the venue before it is bought. Confirm the reference model (206m water coaster), the practical capacity (20 passengers per boat (2 boats)), the power supply (204 kVA installed / 55 kW lift), and the height or clearance (15 m lift) against the site and destination standards.

Technical selection checklist

  • Confirm footprint: 110 m x 50 m
  • Confirm power supply and voltage
  • Confirm guest capacity and expected throughput
  • Confirm foundation or floor loading and site access
  • Confirm the standards accepted in the destination market
  • Confirm customization that affects lead time and documentation

Installation and commissioning

DINIS defines the installation interface before shipment: foundation guidance, installation drawings, on-site supervision or remote review, commissioning and operator handover. The delivered scope states which civil works, utilities and local approvals remain the buyer’s responsibility.

Operator readiness

  • Daily start-up and shutdown checks
  • Restraint or supervision procedures
  • Emergency stop and evacuation practice
  • First-line maintenance and inspection access
  • A starter spare-parts and wear-item list

Spare parts and maintenance

Plan the maintenance calendar and spare-parts lead time before installation. Accessible wear parts and a documented inspection routine protect the service life of the water coaster 206m and reduce avoidable downtime.

Standards and documentation

Applicable design standards, factory test records and inspection documentation available on request. The document set is matched to the delivered configuration and the destination market.

Configuration options

Theming, station, water treatment integration, operator training Each option is reviewed for engineering impact rather than added as decoration.

Extended buyer FAQ

What should I prepare before requesting a quotation? Send the target product or family, available footprint, guest profile, expected throughput, power supply, destination country, customization needs and target opening date.

How do I compare this model with another supplier? Compare the same fields: footprint, practical throughput, power, documentation scope, installation support, spare parts and lead time. Headline price alone hides delivery differences.

Buyer questions

Is the water coaster 206m configurable for a specific site?

Yes. Height, cabin/vehicle configuration, theming, foundation and control systems are confirmed after a site review. Reference configuration: Track length 206m; gauge 1820mm; lift height 15m; cycle time approximately 3 minutes per boat; equipment class A; lift power 55kW; installed capacity 204kVA; boat count 2; footprint 110m x 50m; capacity 20 passengers per boat; drive motor and chain lift; maximum speed 55 km/h; design life 20 years; lift speed 1.2 m/s; power 3N+PE 380/220V 50Hz..

What documentation is provided for the water coaster 206m?

The project package includes foundation guidance, installation drawings, operation manuals and maintenance schedules, subject to the confirmed scope. Reference data: 20 passengers per boat (2 boats) u00b7 110 m x 50 m u00b7 204 kVA installed / 55 kW lift.

Do you support overseas installation?

DINIS can provide installation supervision, commissioning and operator training. Remote support and spare parts are also available.

Related attractions

Continue exploring.

WhatsApp